
Ask for quote
This EcoStruxure EV charging Expert is an EV charger controller providing a dynamic load management for EVlink Pro AC and EVlink Pro DC charging stations. It is recommended for commercial and industrial buildings as well as for fleets depot to optimize the impact of consumption of EV charging infrastructure on an electrical installation. The capacity is to control up to 50 EV charging stations, combined in up to 20 electrical zones with 4 zone levels. This capacity can be upgraded via software license. There is also a possibility to use different functionalities for an efficient EV charging infrastructure operation. Time-of-use electricity tariff can be scheduling to limit EV charging when electricity price is high, and to maximize it when it is low. VIP user badges and charging stations will undergo load-shedding, only in emergency when absolutely necessary to maintain service continuity, as they have priority over other users to charge their electric vehicles. Registering and download of EV charging transactions for analytics, cost allocation or invoicing is possible. There are API for integration capabilities to Building Energy Management System (BEMS). There is priorization of PV produced energy for EV charging. It can be installed in indoor enclosure mounted on a DIN rail. Itâs supplied via external 24Vdc power supply. The IP degree of protection is IP40. The operating temperature is between 0°C and 50°C. The storage temperature is between -20°C and 60°C. The dimensions are (W) 157mm x (H) 150mm x (D) 46mm. The LAN connection network with the EVlink chargers is established through Ethernet connection via RJ45 port and External 8 port switch. It uses OCPP 1.6 Json protocol for communication with EVlink chargers. An external Building Power meter can be also connected in the LAN network. For communication with Charging Point Operatorâs (CPOs), Charging Station Management System (CSMS) uses OCPP 1.6 Json protocol via external 4G modem. The EV charger controller has the CE, UK and RMC certification.
Main
| Characteristic | Value(s) |
|---|---|
| Range | EcoStruxure EV Charging Expert |
| product name | EcoStruxure EV Charging Expert |
| Product or component type | EV charge controller |
| Type of installation | Indoor |
Complementary
| Characteristic | Value(s) |
|---|---|
| Installed device | Modem 3G/4G (to be ordered separately) Meter device (to be ordered separately) |
| Range compatibility | EVlink EVlink Pro AC EVlink EVlink Pro DC EVlink EVlink Smart Wallbox EVlink EVlink parking EVlink EVlink City |
| Device application | To manage the overall energy allocated to each vehicle |
| Mounting mode | Wall mount |
| Mounting support | Rail |
| Mounting position | Horizontal/vertical |
| load management | Dynamic |
| max managed charging stations | 50 charging stations |
| max managed charging points | 100 charge points |
| max nb of zone levels | 4 |
| max nb of zones | 20 |
| functions selection | With priority charging profile With time-of-use settings With PV integration With BEMS integration via API With authentication via badges With transaction logs |
| Communication interface | Ethernet RJ45 Cat.6 to connect device to charging station Ethernet RJ45 to connect device to charging station Modem to connect device to central management system |
| Communication service | Web server for OCPP 1.6 Via Modem |
| OCPP version | JSON |
| [Us] rated supply voltage | 12...24 V DC |
| Power consumption in W | 16 W |
| Input type | Energy meter |
| Electromagnetic compatibility | Conducted and radiated emissions class A conforming to EN 55022 |
| Height | 150 mm |
| Width | 157 mm |
| Depth | 46 mm |
| Product weight | 1 kg |
| Standards | EN/IEC 61131-2 EN 55011 EN/IEC 61000-6-4 |
| Product certifications | CE EAC RCM |
| Targeted country | All |
| Services | Commercial service plan 0...50 °C |
All PLC Direct products come with a 1-year warranty. The warranty is issued by PLC Direct. Warranty coverage commences at the date of purchase. The warranty is for mechanical defects or failures not caused by human factors including but not limited to (a) incorrect installation, (b) operating the unit in sub-optimal conditions or in scenarios not recommended by the manufacturer, (c) poor unit maintenance, etc. The warranty does not cover programming or software related issues.
If the product is eligible for PLC Direct’s warranty coverage and the customer encounters an issue with the product, we will request the item is shipped to us for diagnosis and examination. Regardless of the cause of product issues, the customer will bear responsibility for the cost of shipping the unit to PLC Direct for evaluation. Where the unit was damaged by human factors, we will offer a repair or replace quote; in cases where damage was caused by human factors, the customer is responsible for the cost of shipping the repaired/replaced unit from PLC Direct to the customer. Where the unit was not damaged by human factors but is covered by PLC Direct’s warranty, we will repair or replace the unit at our cost (or, in rare cases, refund you your purchase); in such cases, PLC Direct will bear the cost of shipping the repaired or replaced product back to the customer. It is up to PLC Direct’s discretion whether to repair, replace, or refund the customer in such cases. Diagnoses can take time to complete based on technician availability and the complexity of diagnosis.
In no event shall PLC Direct be liable for any damages except actual damages up to, but not exceeding, the amount paid to us for the product, including we shall not be liable for any consequential or indirect damages or lost profits whether or not advised of same.
PLC Direct offers free shipping worldwide. Product ship from a various warehouses worldwide based on the customer's and the product's location. The estimated delivery date on the product page is PLC Direct's best estimated assuming a US-based shipping destination.
Regardless of where the product is shipping from, PLC Direct covers all duties for US-based shipping destinations. For non-US-based shipping destinations, customers are responsible for duties as appropriate.
PLC Direct's focus is on balancing price with lead time. Some but not all products can be expedited. If you have questions about delivery ETAs, please contact our team.

Ask for quote

"Fast service for obsolete parts"
Increasingly PLC/ HMI control platforms are becoming obsolete and parts are no longer supported, however PLC Direct had the HMI we needed and fast shipping for our system to get back online!
Buyer at GE Health

"Helping us move projects forward"
With supply chain issues increasingly affecting our business, PLC Direct has been there for us to supply the PLC products we need, when we need it. If they don't have it readily available, they find it and provide it quickly and reliably. This has helped us move forward with several projects that would have otherwise taken us many, many months to complete.
Buyer at E-Merge Systems – A Rockwell Integrator










